HOF Downtown Texas Streetscape Improvement Project - Phase 1B Demolition
General Work Description: The scope of work includes, but is not limited to, the demolition and removal of existing pergola structures, concrete benches, brick pavers, bike racks, potted plants, and vegetation as shown on the project plans. Existing irrigation lines shall be capped below grade, and existing electrical lines shall be capped and buried below grade. Decomposed granite shall be placed to address all voids resulting from the removal of existing concrete structures.
Status
Bidding Closed
Bid Date | 1/23/24 2:00pm |
Location
Fairfield, CA
The Engineer’s Estimate for this project is $270,000.