Cement Hill WTP New Entryway Project

The Suisun-Solano Water Authority (SSWA) Cement Hill Water Treatment Plant (CHWTP) New Site Entrance Project is located at the CHWTP at 1200 Manuel Campos Parkway in Fairfield, CA, and includes, but is not limited to, the following: grading and paving of the CHWTP access road and pond berm, installation of drainage and sewer utilities, and installation of a new physical access security system.
Addendum 1 (click to expand/collapse)
Name Size
Addendum No. 1_07.02.2024 71.6 KB
Addendum 2 (click to expand/collapse)
Name Size
Addendum 2 8.7 MB